Skip to content
Ortu Lucis
Menu

Legal

Terms of Sale

Last updated 13 November 2026

These terms cover orders for standard pieces, personalised standard pieces and bespoke work. They sit alongside the quotation, the digital proof and the order confirmation, which carry the numbers — price, quantity and date. Where the two disagree, the order confirmation wins.

Who you are contracting with

Ortu Lucis is operated by Taizhou SUNNY Coast IMP. & EXP. Co., Ltd., No. 6 Rouji Road, Development Zone, Dongcheng Subdistrict, Huangyan District, Taizhou, Zhejiang, China.

Quotations

Every quote is based on quantity and destination country. A quotation is valid for the period stated on it. Prices are in the currency named there and exclude duties, taxes and destination charges unless the quotation says otherwise.

When an order exists

An order exists once both sides have confirmed the same thing in writing — email is enough. That confirmation covers the piece, quantity, price, date and delivery terms.

Production starts after that confirmation and after any deposit it names. Nothing is printed on the strength of a conversation alone.

Payment

Payment terms are set out on the order confirmation. Bank charges are borne by the payer. Work may be held until cleared funds arrive, and the delivery date moves accordingly.

Made-to-order pieces

Every piece is produced to your specification. Colour, texture and small dimensional variation are inherent to sand 3D printing and are not defects.

Raw quartz sand takes in water. Pieces that will meet water are sealed in post-processing with a specialist adhesive; a sealed surface beads water and wipes clean. Watertightness is not guaranteed unless stated on the product page. No liner is supplied. The pieces are not intended for food contact. Dimensions and finish are confirmed per order.

Each piece is checked before packing.

Digital proof and approval

For personalised standards and bespoke work there is one digital proof. Nothing is produced until you approve it; production then follows the approved proof. Changes after approval may change both price and date.

Pieces produced against an approved proof are not returnable for a change of mind or a difference in likeness.

Delivery and risk

Goods are delivered on the terms stated on the order confirmation (Incoterms 2020 where a trade term is named). Risk passes to you at the point stated there.

Other terms can be quoted on request; if they are, they are written on the confirmation.

Inspection and claims

Inspect the goods on arrival and before the packaging is discarded. Claims for arrival damage, quantity shortfall, or a difference from the approved proof should reach me with photographs within 7 days of delivery.

Claims made after that window are hard to support with the carrier and are handled case by case.

Intellectual property

You keep the rights to the 3D files you provide and confirm you are entitled to use them; producing them must not infringe someone else’s rights.

The 3D models we prepare for production are used for this order only. They are not delivered, not supplied separately and not reused for other clients. A mutual NDA can be signed before any file changes hands.

Liability

Liability is limited to the value of the affected order. There is no liability for indirect or consequential loss, including loss of profit or of opportunity.

Force majeure

Events outside reasonable control — factory shutdowns, power restrictions, port closure, transport disruption, epidemic control measures — extend the delivery date rather than creating a claim for it.

Governing law

These terms are governed by the laws of the People’s Republic of China. Disputes go to the courts at the seller’s place of business, unless the order confirmation says otherwise.

Changes to these terms

These terms may be updated. The version that applies to an order is the one in force when that order was confirmed.

Anything unclear, or a clause that does not fit your project? Write to hello@ortulucis.com before the order is confirmed — it is easier to agree on paper first.

Your quote list